We carry the project the whole way, not just the part written at a desk. Commissioning is ours, on site, and acceptance closes with the plant connected and running. We work on site in Italy and abroad, across the time zones and in the languages of the projects we run.
- 01
Analysis and specification
Document survey and a site visit, then a functional specification agreed before any code is written. This is the stage where the contradictions between P&IDs, signal lists and electrical drawings surface, and it is the right stage for them to surface.
- 02
System architecture
Server sizing, redundancy, geographic distribution of nodes, bandwidth between sites, archiving policy. On a distributed system the choices made here cannot be corrected further downstream.
- 03
Development
Software, documentation and test data grow together under version control. What ships to site is exactly what was tested, and it is known which revision it came from.
- 04
FAT
Factory acceptance test in front of the customer, with the plant simulator standing in for the field. Non-conformities are closed here, where they cost a day rather than a trip.
- 05
Installation and commissioning
Server installation, client configuration, connection to field devices and supervised start-up alongside the operators. This stage happens on site, wherever the plant is.
- 06
SAT and acceptance
Verification with the plant connected, signal by signal: that the value arrives, that the command does what it claims, that the alarm raises when it should and clears when it should. This is the point where the system stops being a project.
- 07
Warranty and support
Cover through the warranty period, with agreed response times and logged remote access. The people answering are the people who wrote the system: the knowledge does not get handed between support tiers.
- 08
Evolution and revamping
Plants change: new lines, new obligations, new platform versions. The system is extended and rebuilt in stages, staying in service at every step.